CONSTRUCTION OF POSTBENCANA LYMPH BRIDGE

  • 23rd March 2020 GMT+7
CONSTRUCTION OF POSTBENCANA LYMPH BRIDGE
Workers use heavy equipment leveling land in Muhara Village, Lebak, Banten, Monday (23/3/2020). The Office of PUPR Banten Province built the lymph bridge to be able to pass four wheel vehicles at once avoiding bridge damage if the river water is overflowing. ANTARA PHOTO/Muhammad Bagus Khoirunas/foc.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4288x2848
File size
1.92 MB
Created
23/03/2020 19:20 WIB
Photographer
Muhammad Bagus Khoirunas
Editor
Fanny Octavianus