REPAIR OF THE DERMAGA CONNECTING BRIDGE IN THE PIT

  • 6th August 2020 WIB
REPAIR OF THE DERMAGA CONNECTING BRIDGE IN THE PIT
A number of workers repair the connecting bridge (movable bridge) in Dermaga 1 Merak Port, Banten, Thursday (6/8/2020). The bridge is damaged due to susceptible with the hull of the ship during the bad weather two days ago until temporarily the crossing service at the Merak harbor is transferred to another Dermaga. ANTARA PHOTO/Asep Fathulrahman/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2775
File size
1.29 MB
Created
06/08/2020 18:30 WIB
Photographer
Asep Fathulrahman
Editor
Andika Wahyu