ELECTRICAL NETWORK MAINTENANCE

  • 17 November 2020 14:30 WIB
ELECTRICAL NETWORK MAINTENANCE
The PLN officer of the Work Team In the Traded Procurement (PDKB) installed a gardu protective tool (APG) BS 099 on the parent substation (GI) in Lhokseumawe, Aceh, Tuesday (17/11/2020). The maintenance of the electrical cable network on GI without electrical outages as PLN effort prevents the occurrence of drop voltage (electric dim) and decreased supply of current to consumers. ANTARA PHOTO/Rahmad/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4500x3000
File size
2.15 MB
Created
17/11/2020 14:30 WIB
Photographer
Rahmad
Editor
Andika Wahyu