DREDGING SIDE C CAKUNG RESERVOIR
A number of heavy equipments of Air Power Department (SDA) Jakarta Timur conducts side C Jakarta Garden City (JGC), Cakung, East Jakarta, Monday (14/12/2020). Dredging is done in approximately two meters to accommodate maximum water discharge and minimize floods in the region. ANTARA PHOTO/Suwandy/rwa.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.