THE TREATMENT OF A FLAT BEACH ABRASION
The people witness heavy equipment compiled the rock of the wave breaker, at Muaro Lasak Beach, Padang, West Sumatra, Monday (18/1/2021). Local governments through the source of ready-made funds (DSP) BNPB a number of Rp5,9 billion, conducting emergency transition handling to the restoration of coastal abrasion in Muaro Lasak beach and Peace Merpati Monument. ANTARA PHOTO/Iggoy el Fitra/aww.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.