PREPARATION OF OPERATION TOLL ROAD HOT DRILLS 3A

  • 29th January 2021 GMT+7
PREPARATION OF OPERATION TOLL ROAD HOT DRILLS 3A
The motor rider crosses next to Jalan Tol Bogor Outer Ring Road (BORR) Sweet Wood Toll Gate 2, Bogor City, West Java, Friday (29/1/2021). PT Marga Sarana Jabar (MSJ) as the management of Jalan Tol BORR will operate a hot 3A ruas Simpang Yasmin-Simpang Semplak along 2,85 km while imposeing a new tariff toll BORR is calculated from January 30, 2021 at 00.00 WIB. ANTARA PHOTO/Arif Firmansyah/rwa.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
2678x4000
File size
1.78 MB
Created
29/01/2021 22:00 WIB
Photographer
Arif Firmansyah
Editor
Puspa Perwitasari