SUBMERGED MUD
SIDOARJO, 28/2 - ENDED SUTET. A number of extra high voltage air line towers (SUTET) belongs to PLN, soaked Lapindo heat mud in the Siring Porong region, Sidoarjo, Monday (28/2). The PLN-owned SUTET Tower, has not been functioning for its existence because it has exceeded the minimum distance between the cable and mud surface. PHOTO ANTARA/Eric Ireng/s/ama/11
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.