ELECTRICITY ENERGY METAN
MALANG, 26/3 - METAN ENERGY ELECTRIC. Coderi (47) lighten gas-energy electricity lights in TPA (Last Disposal) Talangagung, Malang, East Java, Saturday (26/3). The electricity produced from the TPA method gas treatment installation of the used goods is air conditioner, the car engine and the water meter is 5000 watts - 22.5 kva and is able to be used for 50 houses even still potentially developed for greater capacity. ANTARA/Ari Bowo Holypto/ed/ama/11.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.