OPERATION OF LAHENDONG PLTP

  • 29th July 2021 GMT+7
OPERATION OF LAHENDONG PLTP
Employees conduct supervision in the control room of the Earth’s Power Generation (PLTP) Lahendong, Tomohon, North Sulawesi, Thursday (29/7/2021). The first PLTP in Sulut was gradually built in 2001-2011 has four plants and has been fully operating with a maximum capacity of 4x20 Mega Watt (MW), as well as able to serve 60,000-80.000 homes with an average range of power 1.300 VA in North Sulawesi region - Gorontalo. ANTARA PHOTO/Adwit B Pramono/rwa.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x1987
File size
1.5 MB
Created
29/07/2021 18:20 WIB
Photographer
Adwit B Pramono
Editor
Puspa Perwitasari