DEVELOPMENT THENSSAR NEW PORT SECOND STAGE

  • 16th August 2021 GMT+7
DEVELOPMENT THENSSAR NEW PORT SECOND STAGE
Heavy equipment operates in the second stage Makassar New Port project development area in Makassar, South Sulawesi, Monday (16/8/2021). The continued development of Makassar New Port second stage which now reaches 77,54 percent with an investment value allocation of Rp2,8 trillion with a 16 hectares container area aimed at strengthening the national logistics system and improving interpulsion connectivity in Indonesia. ANTARA PHOTO/Abriawan Abhe/rwa.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2641
File size
2.69 MB
Created
16/08/2021 21:00 WIB
Photographer
Abriawan Abhe
Editor
Puspa Perwitasari