THANKS TO MANDALIKA BASIC INFRASTRUCTURE WORK

  • 5th October 2021 GMT+7
THANKS TO MANDALIKA BASIC INFRASTRUCTURE WORK
Director of Engineering and SDM ITDC Taufik Hidayat (second right) along the Managing Director 2 LPEI Maqin U. Norhadi (left), General Manager of Operation Department 7 PT WIKA-BRL Rahmad Erwan Pramudya (second left) and Board of Commissioners ITDC Irzani (right) shows the news letter of the event thanks to the basic infrastructure work The Mandalika in the Special Area Road Paddock (JKK) or Mandalika International Street Circuit in Mandalika, Kuta Village, Pujut District, Praya, Central Lombok, NTB, (5/10/2021). The basic infrastructure project is represented by Rp395 billion is part of funding support from Indonesia Export Financing Institution (LPEI) through the National Interest Account (NIA) scheme consisting of work ground work (bunal) Circuit roads throughout 4,3 km, ground improvement (Liquifaction Loading) circuit, Paddock area supporting facilities for basic circuit infrastructure as well as Kuta Beach Park access roads, Circuits and Gerupuk with a total of 6,7 km following water utility networks as well as electricity for non circuit base infrastructure. ANTARA PHOTO/Ahmad Subaidi/foc.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4048x2770
File size
3.4 MB
Created
05/10/2021 14:30 WIB
Photographer
Ahmad Subaidi
Editor
Fanny Octavianus