THANKS TO MANDALIKA BASIC INFRASTRUCTURE WORK

  • 5th October 2021 WIB
THANKS TO MANDALIKA BASIC INFRASTRUCTURE WORK
Director of Engineering and SDM ITDC Taufik Hidayat (second right) along the Managing Director of 2 LPEI Maqin U. Norhadi (right) was in the circuit of Mandalika in the event of the handover received the basic infrastructure work of The Mandalika on Jalan Special Area (JKK) or Mandalika International Street Circuit in Mandalika, Kuta Village, Pujut District, Praya, Central Lombok, NTB, Tuesday (5/10/2021). The basic infrastructure project that is up to Rp395 billion is part of funding support from Indonesia Export Financing Institution (LPEI) through the National Interest Account (NIA) scheme consisting of work ground work (bundle) Circuit roads throughout 4,3 km, ground improvement (Liquifaction Loading) circuit, Paddock area supporting facilities for basic circuit infrastructure as well as Kuta Beach Park access road, Circuit and Gerupuk with a total of 6,7 km following water utility networks as well as electricity for non circuit base infrastructure. ANTARA PHOTO/Ahmad Subaidi/foc.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4048x2701
File size
3.72 MB
Created
05/10/2021 14:30 WIB
Photographer
Ahmad Subaidi
Editor
Fanny Octavianus