UTILIZATION OF PLTS FOR AGRICULTURE

  • 18th November 2021 GMT+7
UTILIZATION OF PLTS FOR AGRICULTURE
Under solar panels located in the Solar Power Plant (PLTS) Tanjung Raja Irrigation built through CSR funds PT Bukit Asam Tbk in Tanjung Raja Village, Muara Enim District, Muara Enim Regency, South Sumatra, Thursday (18/11/2021). PLTS has a capacity of 16 kilowattwatts is used to turn on the water pump that channel the water from the Enim River to the rice fields belonging to the citizens who are about a kilometer with a height of about 30 meters. ANTARA PHOTO/Nova Wahyudi/nz

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2694
File size
4.01 MB
Created
18/11/2021 19:45 WIB
Photographer
Nova Wahyudi
Editor
Zarqoni Maksum