PLTU BRAID.

  • 24th June 2011 GMT+7
PLTU BRAID.
KETAPANG, 24/6 Director of Operation of Indonesia Barat PLN, Moch Harry Jaya Hero (the right place), KADIV Construction and IPP IB PLN, Eko Sudartanto Aris (left), KADIV Distribution and Customer Service IB PLN, Karel Sampe Umbrella (second left), General Manager PLN Unit Induk Construction Plant II, Syah Darwin Siregar (three right), General Manager PLN Western Kalimantan Region, Bambang Budiarto (two left) and Director of PT Wijaya Karya TBK, Slamet Maryono (right) is handy together to sign the construction contract of PLTU Ketapang with capacity 2 x 10W, PLN/6. The construction of this Ketapang PLTU was planned to be completed in the end of March 2013. later by the operation of this Ketapang PLTU will be saving from the use of Oil Fuel by RP. 203 billion per year. ANTARA/H0-Agus/mes/11

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
1500x996
File size
232.55 KB
Created
24/06/2011 19:10 WIB
Photographer
Editor