THE FIRST GOLDEN MINE PROCESSING IN INDONESIA IS SCALED

  • 2nd December 2021 GMT+7
THE FIRST GOLDEN MINE PROCESSING IN INDONESIA IS SCALED
The condition of one of the evolving gold carrier cranes in Cikotok, Lebak, Banten, Thursday (2/12/2021). The culture of the first gold processing production in Indonesia which was built in the Dutch Colonial period it was scaled so that most of the fragile and damaged buildings. ANTARA PHOTO/Muhammad Bagus Khoirunas/foc.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4198x2788
File size
1.13 MB
Created
02/12/2021 22:05 WIB
Photographer
Muhammad Bagus Khoirunas
Editor
Fanny Octavianus