THE FIRST GOLDEN MINE PROCESSING IN INDONESIA IS SCALED
The condition of one of the evolving gold carrier cranes in Cikotok, Lebak, Banten, Thursday (2/12/2021). The culture of the first gold processing production in Indonesia which was built in the Dutch Colonial period it was scaled so that most of the fragile and damaged buildings. ANTARA PHOTO/Muhammad Bagus Khoirunas/foc.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.