OIL PRODUCTION TARGET ROKAN BLOCK

  • 22nd December 2021 GMT+7
OIL PRODUCTION TARGET ROKAN BLOCK
Well treatment at ATS 2517 Rig in Duri Steam Flood (DSF) Field Duri, Rokan Block, Bengkalis, Riau, Wednesday (22/12/2021). PT Pertamina Hulu Rokan (PHR) as part of Subholding Upstream Pertamina targets the production of the Rokan Block oil increased from 160 thousand barrels per day (bph) in 2021 to 300 thousand barrels per day (bph) in 2025. ANTARA PHOTO/Nova Wahyudi

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
1.96 MB
Created
22/12/2021 18:35 WIB
Photographer
Nova Wahyudi
Editor