OIL PRODUCTION TARGET ROKAN BLOCK

  • 22nd December 2021 WIB
OIL PRODUCTION TARGET ROKAN BLOCK
PT Pertamina Hulu Rokan (PHR) workers control the production pipelines originating from the well towards the Central Gathering Station crude oil collecting station (CGS) 10 Field Duri, Rokan Block, Bengkalis, Riau, Wednesday (22/12/2021). PT Pertamina Hulu Rokan (PHR) as part of Subholding Upstream Pertamina targets the production of the Rokan Block oil increased from 160 thousand barrels per day (bph) in 2021 to 300 thousand barrels per day (bph) in 2025. ANTARA PHOTO/Nova Wahyudi/rwa.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
2.13 MB
Created
22/12/2021 19:15 WIB
Photographer
Nova Wahyudi
Editor
Puspa Perwitasari