NEW CRANE II.

  • 18th July 2011 GMT+7
NEW CRANE II.
NANJING, CHINA, 18/7 - INSPEKSI CRANE NEW. GM Port Palembang Andi Isnovandiono (right), GM Port Pontianak Solikhin (2 right), Corporate Secretary Pelindo II Rima Novianti (2 left), and Manager of Planning & Operation Control of Port Long Zulasman conducts inspection of one of the cranes (acceptible loading and unloading tools) type Gantry Jieb ready to ship to Indonesia, in Port Long Tan Container Terminal, Nanjing, China, Monday (18/7). PT Pelndo II has ordered a total of 45 new cranes from China, 13 units including from Nanjing Port Machinery, which will be placed in the port of the western region of Indonesia. ANTARA/Hermanus Prihatna/hp/11

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3876x2588
File size
1.16 MB
Created
18/07/2011 20:05 WIB
Photographer
Hermanus Prihatna
Editor