ESDM MINISTER VISIT IN SOLO
Minister of Energy and Mineral Resources (ESDM) Arifin Tasrif (right) accompanied by Wali Kota Solo Gibran Rakabuming Raka (second right) visited the location of the Garbage Power Plant project (PLTSa) at the End Disposal (TPA) Princess Cempo, Mojosongo, Solo, Central Java, Tuesday (25/1/2022). In his work visit, the Minister of ESDM Arifin Bagrif targeted the PLTSa TPA Putri Cempo Solo can operate full on December 2022 with the stage of electricity production from April 2022 with a capacity of 2 Megawatt, so it is expected on December 2022 is able to produce electricity by 8 Megawatts. ANTARAFOTO/Solar Food/hp.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.