INSTALLATION BIOREACTOR WASTE PROCESSING

  • 4th March 2022 GMT+7
INSTALLATION BIOREACTOR WASTE PROCESSING
The manager checks the metana gas production results from the installation of "Selam Ship Office" for garbage processing in the village of Gondosari, Gebog, Holy, Central Java, Friday (4/3/2022). The bioreactor installation is built to process agricultural waste and farms to organic waste into fertilizers, methane gas and pesticide as well as efforts to reduce waste problems. ANTARA PHOTO/Yusuf Nugroho/wsj.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4928x3264
File size
1.97 MB
Created
04/03/2022 16:25 WIB
Photographer
Yusuf Nugroho
Editor
Widodo S Jusuf