TUNNELING
SEMARANG, 13/8 - EXHIBITIONS. Two heavy tools do fertilizing the soil to divert the Kali Kreo flow to the tunnel of the turtle, on the construction project of the East Java reservoir, in Semarang, Jateng, Saturday (13/8). The construction of a turtle tunnel along 421 meters in the form of a horse tapal with a diameter of 5.6 meters it serves to divert the river water flow around the project. PHOTO ANTARA/R. Rekotomo/ss/Spt/11.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.