TUNNELING

  • 13th August 2011 WIB
TUNNELING
SEMARANG, 13/8 - EXHIBITIONS. Two heavy tools do fertilizing the soil to divert the Kali Kreo flow to the tunnel of the turtle, on the construction project of the East Java reservoir, in Semarang, Jateng, Saturday (13/8). The construction of a turtle tunnel along 421 meters in the form of a horse tapal with a diameter of 5.6 meters it serves to divert the river water flow around the project. PHOTO ANTARA/R. Rekotomo/ss/Spt/11.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
2500x1616
File size
649 KB
Created
13/08/2011 14:50 WIB
Photographer
R. Rekotomo
Editor