CLEAN WATER PROJECT

  • 15th August 2011 WIB
CLEAN WATER PROJECT
TANGERANG, 15/8 - WATER PROJECT. President Director of PT Aetra Air Tangerang Abdulbar M.Mansoer (left) accompanied by Director of Engineering Edi Sasono (right) checked the installation of clean water treatment (WTP) PT Aetra Air Tangerang in Sepatan, Tangerang District, Monday (15/8). Aetra has started the first stage production of 350liters/seconds from total 900 liter/water production plan ready to drink so that it can serve 72,000 household joints or industries or equivalent to 350,000 people service. ANTARA/Muhammad Deffa/mes/11

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
2891x1667
File size
909.31 KB
Created
15/08/2011 20:30 WIB
Photographer
Editor