CALCULATE THE VOLUME OF MUDIC CURRENT
INDRAMAYU, 25/8 - HITUNG VOLUME ARUS MUDIK. The officer calculated the volume of vehicles used for the mud at the intersection of Celeng, Loh Bener, Indramayu, West Java, Thursday (25/8). The mud flow on the pantura path is estimated to reach the peak at H-4 and H-3 Width. PHOTO ANTARA/Puspa Perwitasari/11
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.