EVAPORATION OF THE RAILWAY FLEET PT KAI DAOP 4 A WIDE RIDGE PERIOD
A number of train passengers running at the Semarang Tawang Station, Central Java, Friday (22/4/2022). PT KAI Operation Area (Daop) 4 Semarang prepares 16 train travels every day, by supporting 14 locomotives and 100 train circuits for economic, executive, and train generations, as well as local lines Kedungsepur prepared 6 diesel railways as passenger spike anticipation in Lebaran’s mud period. ANTARA PHOTO/Aji Styawan/hp.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.