PETROLEUM POWER PLANT PERTAMINA

  • 25 April 2022 19:00 WIB
PETROLEUM POWER PLANT PERTAMINA
Technicians check the hot water steam channel from separator in the geothermal power generation (PLTP) Binary Organic Rankine Cycle(ORC) capacity 500 KW managed by PT Pertamina Geothermal Energy (PGE) at Lahendong, Tomohon, North Sulawesi, Monday (25/4/2022). The geothermal power generation (PLTP) Binary Organic Rankine Cycle (ORC) is a pilot project for the application of binary technology or the optimization of hot water vapor from Lahendong geothermal wells for electricity production, and PT Pertamina Geothermal Energy (PGE) plans to moisten the binary PLTP with a capacity of reaching 25 MW as a commitment to realizing new and bible energy sources. ANTARA PHOTO/Reno Esnir/YU

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2663
File size
1.87 MB
Created
25/04/2022 19:00 WIB
Photographer
Reno Esnir
Editor
Yusran Uccang