MUD FLOW AT THE HARBOR PORT STARTS CROWDED
A number of private vehicles that will cross to the island of Sumatra is stuck long maturity among the queues of truck expeditions in Merak Port, Cilegon, Banten, Tuesday (26/4/2022). As much as the increase in the amount of PT ASDP Merak’s mud flow adds to the number of trips/trip ferry ships from 72 trips to 77 trips since Monday (25/4) and overall total passengers crossing up sharply within 3 days from 23.650 people become 35.075 people on Monday (25/4) yesterday with the details of the number of pedestrian passengers as many as 627 people and 34.440 people in the vehicle. ANTARA PHOTO/Asep Fathulrahman/aww.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.