LAPINDO - MUD PIPE
PORONG, 29/10 - LUMPUR PIPE. A worker is to connect additional pipes for heat mud flow, on the side of the passage, Monday (29/10). Pipe for the flow of heat sludge disposal to the passage, continues to be added to anticipate the lubrication of heat mud during the rainy season. PHOTO:ANTARA/Eric Ireng/nz/07.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.