DRY DUNGSENGON RESERVOIR

  • 21st September 2011 WIB
DRY DUNGSENGON RESERVOIR
KEDIRI, 21/9 - RESPONSIBILITY OF RING. A citizen sees the conditions of Kedungsengon reservoir, in Balunggebang Village, Gondang District, Nganjuk, East Java, Wednesday (21/9). In normal conditions, the 1973-built Kedungsengon reservoir has a 560.000 cubic meter per second (m3/second) and is able to accommodate 2.5 million m3. reservoir capacity is able to supply technical irrigation water for 12,000 haah saw. But since July 2011 the reservoir has dried a total and can’t envy rice fields that depend on the technical irrigation of the reservoir. PHOTO ANTARA/Arief Priyono/s/pd/11

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x1893
File size
1.54 MB
Created
21/09/2011 19:45 WIB
Photographer
Arief Priyono
Editor