HIGHEST POWER LOAD

  • 19th October 2011 GMT+7
HIGHEST POWER LOAD
BOOKING, 18/10 - HIGH ELECTRIC BEBAN. Workers check the panels in the Diesel Power Generation Control Room (PLTD) operated by PT Indonesia Power, in Pesanggaran, Bali, Tuesday (18/10). The peak load of electricity consumption in Bali prints the highest record of 579 megawatt (MW) during the day is recorded Monday (18/10), while the electricity consumption in the territory of Bali has reached 3.2 Twh, with the use of BBM Kit reached approximately 763 million liters a year. PHOTO ANTARA/Yudhi Mahatma/11

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x1996
File size
498.99 KB
Created
19/10/2011 01:05 WIB
Photographer
Yudhi Mahatma
Editor