UTILIZATION OF PLTS FOR CAMPUS

  • 7th July 2022 GMT+7
UTILIZATION OF PLTS FOR CAMPUS
A lecturer monitors the use of electricity from the installation of Solar Power Generation (PLTS) on the campus of the Institute of National Technology (ITN) Malang, East Java, Thursday (7/7/2022). The PLTS uses a connected system with PLN electrical networks or called On Grid installation utilizes 1.111 solar panels and is able to produce flat electricity energy per day of 2,250 kWh used to meet the needs of ITN campus. ANTARA FOTO/Ari Bowo Sucipto/rwa.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3456x2304
File size
2.35 MB
Created
07/07/2022 13:20 WIB
Photographer
Ari Bowo Sucipto
Editor
Puspa Perwitasari