NORMALIZATION PROGRESS

  • 20th August 2022 GMT+7
NORMALIZATION PROGRESS
Heavy equipment air photo eskavator complete the normalization project Kali Bekasi package 1 at Pondok Gede, Bekasi, West Java, Saturday (20/8/2022). The Ministry of PUPR through the Cisadane River Large Hall (BBWSCC) conducts the control of Flood Kali Bekasi package 1 that has reached 50 percent and targeted finished in 2023. ANTARA PHOTO/Fakhri Hermansyah/foc.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2246
File size
1.54 MB
Created
20/08/2022 13:15 WIB
Photographer
Fakhri Hermansyah
Editor
Fanny Octavianus