TARGET INSTALLATION ROOF PLTS

  • 27th September 2022 WIB
TARGET INSTALLATION ROOF PLTS
Solar panel air photos on Solar Power Generation (PLTS) in Parliament Complex, Senayan, Jakarta, Tuesday (27/9/2022). The government targets the installed capacity of Solar Power Generation (PLTS) Roof at 2025 reached 3.600 Mega Watt (MW) or about 3.6 Giga Watt (GW) previously according to the ESDM Ministry data installed capacity of the Roof PLTS on December 2021 recorded by 48.79 MW with a number of customers by 4.794 spread across Indonesia. ANTARA PHOTO/Predipta/rwa.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2665
File size
1.25 MB
Created
27/09/2022 14:50 WIB
Photographer
Galih Pradipta
Editor
Puspa Perwitasari