PERESMIAN ENERGY WADUK MUARA NUSA DUA

  • 11th November 2022 WIB
PERESMIAN ENERGY WADUK MUARA NUSA DUA
The officer conducts the treatment of solar power generation inauguration system (PLTS) Floating Muara Nusa Dua reservoir in Badung Regency, Bali, Friday (11/11/2022). The 100 Kwp-capacity PLTS is built to support the electricity supply of KTT G20 as well as the form of Indonesia’s commitment in supporting renewable and sustainable economic programs. ANTARA PHOTO/Media Center G20 Indonesia/Aditya Pradana Putra/nym.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2662
File size
1.13 MB
Created
11/11/2022 19:10 WIB
Photographer
Aditya Pradana Putra
Editor
Nyoman Budhiyana