PERESMIAN ENERGY WADUK MUARA NUSA DUA

  • 11th November 2022 GMT+7
PERESMIAN ENERGY WADUK MUARA NUSA DUA
Minister of Coordinator of Kemaritiman and Investment as well as Chairman of the Support of the High-level Conference Event (KTT) G20 Indonesia Luhut Binsar Pandjaitan (second left), Minister of Public Works and Housing of the People of Basuki Hadimuljono (left three), President Director of PT PLN (Persero) Darmawan Prasodjo (left) reviewed the Solar Power Plant (PLTS) Floating Muara Nusa Dua reservoir in Badung District, Bali, Friday (11/11/2022). The 100 Kwp-capacity PLTS is built to support the electricity supply of KTT G20 as well as the form of Indonesia’s commitment in supporting renewable and sustainable economic programs. ANTARA PHOTO/Media Center G20 Indonesia/Aditya Pradana Putra/nym.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2662
File size
1.1 MB
Created
11/11/2022 19:10 WIB
Photographer
Aditya Pradana Putra
Editor
Nyoman Budhiyana