INFRASTRUCTION BUMI PIPE GAS BUMI IN KITB

  • 16th November 2022 GMT+7
INFRASTRUCTION BUMI PIPE GAS BUMI IN KITB
Director of Infrastructure and Technology PGN Achmad Muchtasyar (center) accompanied by Assistant Deputy Energy of Oil & Gas Ministry of BUMN Abdi Mustakim (second left), and Head of Department of ESDM Central Java Province Sujarwanto Dwiatmoko (left) saw gas pipeline when First Welding ceremony or first welding ceremony of Earth Gas Distribution Pipe in Integrated Industrial Area (KITB), Rod Regency, Central Java, Wednesday (16/11/2022). Subholding Gas Pertamina PT. PGN builds petroleum pipeline infrastructure to KITB which is sourced from PT Pertamina EP Cepu (PEPC) Jambaran Tiung Blue (JTB) with 8 inch pipe diameter along 7,3 kilometers with pressure 17 Barg and pipe flow capacity of 25 MMSCFD with KITB potentially absorb 24,8 MMSCFD from 14 tenants to realize the supply of clean energy for industrial areas especially in KITB. ANTARA PHOTO/Harviyan Prime Putra/foc.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3621x2414
File size
1.79 MB
Created
16/11/2022 14:30 WIB
Photographer
Harviyan Perdana Putra
Editor
Fanny Octavianus