INFRASTRUCTION BUMI PIPE GAS BUMI IN KITB

  • 16th November 2022 GMT+7
INFRASTRUCTION BUMI PIPE GAS BUMI IN KITB
Director of Infrastructure and PGN Achmad Muchtasyar Technology (right quarter) accompanied by President Director KITB Ngurah Wirawan (right), Assistant Deputy of Oil & Gas Ministry of BUMN Abdi Mustakim (right three), and Head of Department of ESDM Central Java Province Sujarwanto Dwiatmoko (right five) saw the process of welding gas pipes when First Welding Ceremony or the first welding ceremony of the Earth Gas Distribution Pipe in the Integrated Bar Industry Area (KITB), Rod Regency, Central Java, Wednesday (16/11/2022). Subholding Gas Pertamina PT. PGN builds petroleum pipeline infrastructure to KITB which is sourced from PT Pertamina EP Cepu (PEPC) Jambaran Tiung Blue (JTB) with 8 inch pipe diameter along 7,3 kilometers with pressure 17 Barg and pipe flow capacity of 25 MMSCFD with KITB potentially absorb 24,8 MMSCFD from 14 tenants to realize the supply of clean energy for industrial areas especially in KITB. ANTARA PHOTO/Harviyan Prime Putra/foc.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
2.04 MB
Created
16/11/2022 14:30 WIB
Photographer
Harviyan Perdana Putra
Editor
Fanny Octavianus