TARGET CAPAIAN NEW ENERGI SIZE LATEST
The cattle are around the Bayu Power Generation location (PLTB), South Sulawesi, Sunday (4/12/2022). The State Electricity Company (PLN) records the odor of new and renewable energy (EBT) installed in a number of power plants to August 2022 has reached 12.7 percent of the target of the composition of the odorran of 23 percent at 2025. ANTARA PHOTO/Abriawan Abhe/YU
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.