TARGET CAPAIAN NEW ENERGI SIZE LATEST

  • 4th December 2022 GMT+7
TARGET CAPAIAN NEW ENERGI SIZE LATEST
Bayu Power Plant (PLTB) operates in Jeneponto Regency, South Sulawesi, Sunday (4/12/2022). The State Electricity Company (PLN) records the odor of new and renewable energy (EBT) installed in a number of power plants to August 2022 has reached 12.7 percent of the target of the composition of the odorran of 23 percent at 2025. ANTARA PHOTO/Abriawan Abhe/YU

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x1990
File size
2.25 MB
Created
04/12/2022 20:35 WIB
Photographer
Abriawan Abhe
Editor
Yusran Uccang