NEW ENERGY CONFIGURATION RESPONSIBILITY IN NTB

  • 14th December 2022 GMT+7
NEW ENERGY CONFIGURATION RESPONSIBILITY IN NTB
A worker conducts routine inspection in the turbine engine space of the Mini Hydro Power Plant (PLTMH) Fresha in Bentek Village, Gangga District, North Lombok, NTB, Wednesday (14/12/2022). PT PLN (Persero) recorded the potential of renewable new energy (EBT) in West Nusa Tenggara Province reached 254,6 megawatts (MW) consisting of a wide range of EBT potential sources namely microhidro and water (PLTMH and PLTA), bayu or wind (PLTB), solar power (PLTS), biomass (PLTBm), geothermal (PLTP) and sea flow (PLTAL). ANTARA PHOTO/Ahmad Subaidi/wsj.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4048x2693
File size
2.04 MB
Created
14/12/2022 12:50 WIB
Photographer
Ahmad Subaidi
Editor
Widodo S Jusuf