TOUR DE LOMBOK SUMBAWA

  • 13th December 2011 GMT+7
TOUR DE LOMBOK SUMBAWA
TANJUNG, 13/12 - TOUR DE LOMBOK SUMBAWA. A number of racers began the first etape crossed the Nipah beach tourism area on the "Tour de Lombokwa (TdLS) 2011" in the Winner District, North Lombok District, NTB, Tuesday (13/12). Tour de Lombok Sumbawa 2011" which lasts 13-15 December 2011 involves 90 trees combined in 18 international and national level teams that ave 400 km along with 3 etapes. ANTARA/Ahmad Subaidi/ed/nz/11

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3048x1920
File size
696.53 KB
Created
13/12/2011 17:15 WIB
Photographer
Ahmad Subaidi
Editor