PRESIDENT RESPONSIBILITY IN BULELENG BALI

  • 2nd February 2023 GMT+7
PRESIDENT RESPONSIBILITY IN BULELENG BALI
President Joko Widodo (second left) accompanied by Minister of PUPR Basuki Hadimuljono (second right), Minister of Agrarian and Tata Space/Head of the National Land Agency (ATR/BPN) Hadi Tjahjanto (left), Secretary of the Premono Anung Cabinet (left three) and Governor of Bali Wayan Koster (right) reviewed the Bendungan Tamblang during his in Sawan Village, Buleleng, Bali, Thursday (2/2/2023). The President inaugurates the dam built since 2018, with a budget of Rp820 billion which has a capacity of 5.7 million m3 and an area of 29,8 ha hectares used for rice irrigation and reduces the risk of flooding. ANTARA PHOTO/Nyoman Hendra Wibowo/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
2.01 MB
Created
02/02/2023 15:50 WIB
Photographer
Nyoman Hendra Wibowo
Editor
Andika Wahyu