PRESIDENT RESPONSIBILITY IN BULELENG BALI

  • 2nd February 2023 GMT+7
PRESIDENT RESPONSIBILITY IN BULELENG BALI
A number of artists observe Bend Tamblang in Sawan Village, Buleleng, Bali, Thursday (2/2/2023). President Joko Widodo inaugurates the dam built since 2018 with a budget of Rp820 billion and has a capacity of 5.7 million m3 and an area of 29,8 hectares used for paddy irrigation and reduces the risk of flooding. ANTARA PHOTO/Nyoman Hendra Wibowo/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
2.29 MB
Created
02/02/2023 15:50 WIB
Photographer
Nyoman Hendra Wibowo
Editor
Andika Wahyu