TAMBLANG BENDUNGAN DEVELOPMENT IN BULELENG BALI

  • 2nd February 2023 WIB
TAMBLANG BENDUNGAN DEVELOPMENT IN BULELENG BALI
A number of artists conducting the simulation of delivery in Bendungan Tamblang area in Sawan Village, Buleleng, Bali, Thursday (2/2/2023). The development of the dam serves to flow 588 ha irrigation water and as a raw water provider for three sub-districts of 510 liters per second that can serve about 40 thousand family heads to increase agricultural productivity, meet the needs of raw water, reduce the risk of flooding and improve the economy of society. ANTARA PHOTO/Nyoman Hendra Wibowo/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
4000x2666
File size
2.36 MB
Created
02/02/2023 15:50 WIB
Photographer
Nyoman Hendra Wibowo
Editor
Andika Wahyu