PRESIDENT RESPONSIBILITY IN BULELENG BALI

  • 2nd February 2023 GMT+7
PRESIDENT RESPONSIBILITY IN BULELENG BALI
President Joko Widodo (mid) accompanied by the Minister of Agrarian and Tata Space/Head of the National Land Agency (ATR/BPN) Hadi Tjahjanto (left three) and the Secretary of the Anung Premono Cabinet (left quarter) pressed the cirma button as a sign of the Tamblang Damage in Sawan Village, Buleleng, Bali, Thursday (2/2/2023). The President inaugurates the dam built since 2018, with a budget of Rp820 billion which has a capacity of 5.7 million m3 and an area of 29,8 ha hectares used for rice irrigation and reduces the risk of flooding. ANTARA PHOTO/Nyoman Hendra Wibowo/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
2.58 MB
Created
02/02/2023 15:50 WIB
Photographer
Nyoman Hendra Wibowo
Editor
Andika Wahyu