ELECTRIC PANEL REPAIR

  • 26th November 2007 WIB
ELECTRIC PANEL REPAIR
JAKARTA, 26/11 - CARD PANEL. A workers check the post-fire electricity panel in the Water Production Installation (IPA) Buaran in Jakarta, Monday (26/11). Thames Pam Jaya (TPJ) stated that it has corrected the connection of the electrical penalty with a transimi Buaran 2 pump so that it has been deducted as usually related to the damage of electrical panels resulting in the silence of the supply of clean water to the Cilincing Distribution Center on November 17, then. ANTARA/Andika Wahyu/hp/07.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
2048x1283
File size
279.1 KB
Created
26/11/2007 18:28 WIB
Photographer
Andika Wahyu
Editor