POWER SUPPLY

  • 3rd January 2012 GMT+7
POWER SUPPLY
TANGERANG, 3/1 - ELECTRIC SUPPLY. A number of labor installs electrical cable in the High Extra Voltage Air Line Pole (SUTET) on the road Cadas nailn, Tangerang, Banten, Tuesday (3/1). A number of SUTETs that stand in Tangerang area is part of the 3 Banten Lontar PLTU project that will strengthen the supply of electricity as well as part of the 10,000 megawatt power generation project as the oldest in Presidential Regulation Number 71 of 2006. ANTARA/Lucky.R/ss/NZ/11

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
1772x1147
File size
168.11 KB
Created
03/01/2012 18:40 WIB
Photographer
Lucky.r
Editor