BACKPACKING IN JAYAWIJAYA
JAYAPURA 29/5 - VOLTAGE OF TEMBAGA. The copper ore mining place at a height of 3.400 meters at one of the peaks of Jayawijaya mountains. In the form of a mountain called Ersberg.Wes(29/5/1980) Now the mountain was lost even excavated until the depth of 60 meters. The result is 8.500 tons of copper ore per day. Now 5,000 tons per day that will be weighed with the expected underground mining results 4,500 to per day on the first half of 1981. ANTARA PHOTO/ABM/s/hp/dw
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.