Increased dock at Gilimanuk Port
Workers implement pier development in Gilimanuk Port, Jembrana, Bali, Sunday (23/6/2023). PT ASDP conducts an increase in the status of the IV dock at the port from ponton to Mobile Bridge (MB) with its capacity from the original 30 tons to 90 tons so it is expected to speed up the sandar schedule on the Ketapang-Gilimanuk line. ANTARA PHOTO/Budi Candra Setya/nym.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.